Description of Work: The Loyola Avenue Bridge at Foothill Expressway in Los Altos will be widened 23’ on north side and 15’ on south side. This will require work in the Foothill expressway, and on Loyola Drive and adjacent streets. New construction will provide one through lane and one left-turn lane in each direction, a bike lane and a sidewalk in each direction.

 

In general, the structure work to be done consists of excavation for the foundation in the expressway median, building the bridge foundations and columns, partial removal of retaining walls and replacement with abutment structures, erection of precast prestressed concrete slabs, and replacing the barrier railings


Construction Schedule:  Summer 2014-2015