Skip to navigation Skip to content Skip to footer
Search SCCGOV Main Portal

Past and Present FAA Grant Documents

FAA Project Documents

Past and Present FAA Grant Documents
RHV
, E16 & PAO

Airport
FAA Project Description
FAA Grant Number
Grant Amount
FAA Participation Percentage
Applicant Date
Award Date
BOS Action Date
RHV

The FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.

RHV Planning for pavement management 3-06-0225-14
$50,350
95%
08-15-2011, X
07-01-2011, X
09-12-2011 05-10-2011 a, s, F85
RHV Noise Mitigation Measures for Residences within 65-69 DNL 3-06-0225-13
$450,000
95%
06-23-2006 06-20-2007 06-19-2007
RHV Install perimeter Fencing and Gates - Phase 2 3-06-0225-12
$551,300
95%
04-27-2007 08-20-2007 04-10-2001
RHV Install Noise Monitoring System 3-06-0225-11
$ 1,200,000
95%
06-23-2006 06-16-2006 04-29-2003 ,S
RHV Signing and marking modifications: rehabilitate apron, phase 2 3-06-0225-10
$435,000
95%
04-14-2005 07-05-2005 03-22-2005
RHV Acquire security enhancements (perimeter fence, gates and access control) 3-06-0225-09

$ 554,500

95 %
06-23-2003 08-11-2003

04-29-2003

RHV Improve airport drainage (hangar taxilane and apron areas), phase II; rehabilitate apron (approx. 144,000 s.f.); rehabilitate road access (approx. 60,000 s.f.); install perimeter fencing and gate; install navaids (wind indicator, segmented circle, beacon tower); rehabilitate Runway 13L-31R REIL and pilot controlled lighting 3-06-0225-08
$774,100
90%
04-11-2002 09-18-2002 04-10-2001
03-22-2005​
07-17-2006​
RHV Apron/taxiway drainage improvements, apron rehab, access road rehab, security fence and gates, wind indicators and segmented circle, REIL, PCL, beacon tower and electrical service rehab. 3-06-0225-07
$180,000
90%
04-11-2001 08-15-2001 04-10-2001
RHV Conduct Master Plan Study 3-06-0225-06
$280,000
90%
09-14-1999
05-23-2000
09-22-2000
09-27-1999
09-19-2000
RHV FAR Part 150 Airport Noise Compatibility Planning Study 3-06-0225-05
$168,000
90%
04-17-1997 08-10-1998 09-29-1998
RHV Runway/taxiway rehabilitation, apron rehabilitation, lighted airfield signs, drainage, and reconstruction of perimeter access road. 3-06-0225-04
$1,748,250
90%
08-20-1998 09-03-1998 09-29-1998
RHV Runway/Taxiway rehab - Originally to create/add tiedowns 3-06-0225-03
$539,863
90%
08-15-1988 09-07-1988 08-03-1988
RHV Expand aircraft tiedown apron including drainage, fence, tiedowns, lighting/markings 3-06-0225-02
$900,000
90%
04-08-1984 05-14-1984
10-06-1985
04-20-1984
03-08-1984
06-26-1984
07-08-1996
RHV Land acquisition/airport development (5.1 acres) 8-06-0225-01
$22, 145
53.72%
04-13-1971 06-08-1971 06-22-1971
RHV Install apron floodlighting; construct apron extension (approx. 100,000 sq. ft) including tie-downs; construct apron edge taxiway extension (30 ft. x 400 ft.) 9-04-128-C907
$30,145
53.62%
10-21-1968 01-21-1969 09-10-1969
RHV Installation of MI Taxiway Lighting System and Ducts 9-04-128-D906
$12,000
53.63%
04-08-1968 07-03-1968 07-19-1968
RHV Construction of aircraft parking apron including tie-downs (approximately 150,000 s.f.); relocation of remote control panel from vault to control tower; lighting of ramp parking area. 9-04-128-D805
$37,215
53.63%
05-01-1967
07-24-1967
10-19-1967 04-21-1967
06-09-1967
06-23-1966
RHV Construct Apron with tiedowns and a drainage system on the same side of the airport. 9-04-128-D604
$78,708
53.64%
04-23-1966 06-21-1966  
RHV Land Acquisition Parcels 03-1/-3-2, clear/drain site, runway/taxiway construction, apron, fence, waterline 9-04-128-D503
$346.570
53.96%
03-09-1964 10-26-1964 09-13-1965
RHV Land Acquisition Parcels 1, 2 & 3 9-04-125-D201
$363,285
53.89 %
05-23-1963 10-26-1962 06-25-1962
RHV Land Acquisition Parcels 1, 2 & 4, relocate Cunningham Ave 9-04-125-D402

$398,010

53.89 %

03-12-1963 09-14-1963

10-17-1963

     
     
Airport
FAA Project Description
FAA Grant Number
Grant Amount

FAA
Participation Percentage

Applicant Date
Award Date
BOS Action Date
E16 The FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.
E16 Planning Grant - Pavement Management 3-06-0229-09
$52,250
95%
08-15-2011, X
07-01-2011, X
09-12-2011 05-10-2011 a, s
E16 Prepare and Environmental Assessment (This grant was returned to the FAA due to inability of AEF to fund CEQA requirements) 3-06-0229-08
$400,000
95%
  06-17-2008 03-22-2005
E16 Install Miscellaneous NAVAIDS, Install Perimeter Fencing 3-06-0229-07
$554,000
95%
1 2 3 08-13-2007 03-22-2005
E16 Remove obstruction for approach protection 3-06-0229-06
$ 150,000
95%
04-14-2005

06-14-2005

03-22-2005
E16 Acquire security enhancement (perimeter fence, gates and access controls); Install AWOS IIIP 3-06-0229-05
$529,000
95%
06-23-2003 08-12-2003 04-29-2003
E16 Install Fire Water Line Extension (approx. 2,000 lf); Construct Access Road (approx 20' x 1,100') and security access control gate (2 ea), Phase 1 3-06-0229-04
$300,000

95%

07-05-2002 09-18-2002 06-04-2002
E16 Airport Master Plan for South County Airport 3-06-0229-03
$235,000
90%
09-14-1999
04-11-2001
09-18-2002
08-06-2001
04-10-2001
E16 FAA approved (4/83) and BOS agreed (9/87) upon FAA payment of 1,215,000 for airport runway project improvements with the 1982 airports masterplan 3-06-0229-02
$1,215,000
90%
  09-18-1987 09-01-1987
    3-06-0229-01
     
               
E16 Land Acquisition Parcel Nos. 822-13-37, 38, 43, 44, 45, 46, 47, 48, 49, 50, 51, 54, 55, 70, 71, 72, 77, 80, 82, 86, 102, 104 (250+/- acres)  
$2,050,000
  06-12-1970    
E16 1. Land Acquisition Parcel Nos. 13-37, 38, 43, 44, 45, 49, 50, 51, 52, 54, 70, 71, 72, 76, 77, 80, 81, 82, 85, 86, 87 (180+ Acres)
2. Land Acquisition Parcels Nos. 13-46, 47, 55, 68, 72 (70+/- acres, including clear zone & access at Southerly end)
 
$1,780,000
n/a
10-01-1968 denied
05-23-1969
10-21-68
E16 Land Acquisition  
$2,10,000
n/a
11-16-1967 denied 04-25-1968  
E16 Land Acquisition  
$1,942,000
n/a
04-03-1967 pulled by BOS
06-05-67
Airport
FAA Project Description
FAA Grant Number
Grant Amount
FAA Participation Percentage
Applicant Date
Award Date
BOS Action Date
PAO              
PAO The FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.
PAO Planning Grant - Pavement Management 3-06-0182-08
$57,000
95%
08-15-2011, X
07-01-2011, X
09-12-2011 05-10-2011 a, s
PAO Rehabilitate Access Road 3-06-0182-07
$525,000
95%
  08-13-2007  
PAO Security enhancement (perimeter fence, gate, access control), design only; install weather reporting equipment (AWOS) and pilot controlled lighting. 3-06-0182-06
$300,000
95%
07-13-2005 08-02-2005 03-22-2005
PAO Rehabilitate Access Road (Embarcadaro Road) and install security gate 3-06-0182-05
$450,000
90%
06-23-2003 08-12-2003 04-29-2003
PAO Conduct Masterplan Update 3-06-0182-04
$135,000
90%
09-14-1999
05-23-2000
08-22-2000
08-06-2001
09-19-2000
PAO Reconstruct/overlay apron (approx. 700,000 sq.ft.) including tiedown anchors and marking 3-06-0182-03
$1,033,817
90%
09-14-1994 09-30-1994 04-21-1996
PAO Runway/parallel taxiway overlay (approx. 280,000 sq.ft.); reconstruct/overlay apron (approx 100,000 sq.ft.) including tiedown anchors and marking; drainage improvements, apron security lighting; and security fencing (approx. 7,000 LF) including automatic drive gates 3-06-0182-02
$1,200,000
90%
08-17-1993 09-21-1993 09-28-1993
PAO FAR 150 Noise Study 3-06-0182-01
$85,230
90%
08-07-1987 08-30-1988 09-27-1988
PAO Construct aircraft parking apron including tie-downs (220,000 sq ft) 9-04-052-7006
$85,000
53.72%
08-15-1969 12-18-1969 ltr 12-30-1969
PAO Site preparation; fill for Runway 12L/30R and dike construction. Construction of aircraft parking apron (approx. 130,000 sq.ft.), drainage and tie-downs including conformance to existing apron 9-04-052-D905
$128,279
53.62%
07-15-1968 03-07-1969 unknown
PAO Construct Apron area (approx. 360,000 sq.ft.). Reconstruct and widen parallel taxiway with connecting taxiways and holding apron 9-04-052-D602
$99,006
53.64%
05-02-1966 06-20-1966  
PAO Installation of MI taxiway lights, relocation of remote control console from vault to control tower, installation of cable between existing beacon and vault, and installation of cable duct to service runway and wind cone lighting 9-04-052-D804
$12,922
53.63%
03-11-1967 05-23-1968 05-27-1968
PAO Construct levees, place site fill, and relocate discharge lines from existing storm drainage pumping plant 9-04-032-D803
$121,284
53.63%
06-19-1967 12-26-1967 12-27-1967
PAO Overlay, mark and light (MIRL) runway (65' x 2500') including shoulder preparation and drainage; construct apron (approximately 205,000 sq. ft.); install airport beacon and tower; taxiway guidance signs, lighted wind cone, and vault 9-04-052-D501
$64,461
53.96%
11-04-1963 10-14-1964 11-04-1963
​​​​​​​​​
Last updated: 11/20/2018 11:36 AM